Building Regulation Part F
Means of Ventilation

New dwellings will now require post-completion testing of ventilation equipment for dwellings.
All domestic ventilation systems should be tested from a basic extract fan in the toilet to the supply and extract valves in a mechanical ventilation with heat recovery system.
Testing comprises of the following:
- Checking correct size and number of background ventilators.
- Ensuring internal doors have sufficient undercut to allow air transfer between rooms i.e. 10mm over and above final floor finish.
- Ducted systems have been installed to reduce air resistance and leakage.
- Ensure there is sufficient access for routine maintenance.
- Confirmation that each fan unit meets the minimum flow rate standards in the Domestic Ventilation Compliance Guide.
- A report is require for each installed address for Building Control approval.
- Ensuring ventilation ductwork within unvented spaces is suitably insulated
Gladwood use calibrated testing equipment and produce the required reports to demonstrate your building is compliant with Part F.