New dwellings will now require post-completion testing of ventilation equipment for dwellings.

All domestic ventilation systems should be tested from a basic extract fan in the toilet to the supply and extract valves in a mechanical ventilation with heat recovery system.

Testing comprises of the following:

  • Checking correct size and number of background ventilators.
  • Ensuring internal doors have sufficient undercut to allow air transfer  between rooms i.e. 10mm over and above final floor finish.
  • Ducted systems have been installed to reduce air resistance and leakage.
  • Ensure there is sufficient access for routine maintenance.
  • Confirmation that each fan unit meets the minimum flow rate standards in the Domestic Ventilation Compliance Guide.
  • A report is require for each installed address for Building Control approval.
  • Ensuring ventilation ductwork within unvented spaces is suitably insulated
Gladwood use calibrated testing equipment and produce the required reports to demonstrate your building is compliant with Part F.

pdf

Subscribe for news

Homeowners carrying out improvements such as extensions and loft conversions could be asked to increase...
Read more
Contact Gladwood
Accreditations
© 2007 - 2012 Gladwood Design Limited. Website design by 23ccc Creative.
Low Carbon Consultants